Anatomy of a refurb: where the budget goes


#1

Thought this was an interesting article, if a bit sparse on detail

45% construction costs
30% fittings and finishes
19% professional fees
1.5 % planning and utility
4.5% contingency

It says the author is an architect and design consultant but doesn’t say where she gets these % figures from